페이지

2014년 1월 20일 월요일

호주의 질롱, Library and Heritage Centre 건립 중




The dome-shaped Library and Heritage Centre for Geelong, southwest of Melbourne, may change for ever the traditional concept of a library.
출처 http://www.geelongaustralia.com.au/glhc/

Geelong
Image: ARM Architecture
Construction has begun on the $45.5 million building, designed by ARM Architecture, will be a nine-storey facility providing access to information through print collections and the latest multi-media platforms. 
The Geelong Library and Heritage Centre will stretch over more than 6,000 square metres and will include a children’s exploration and discovery zone, a heritage centre repository and reading room, a youth area and individual and group study spaces. There will also be a coffee shop, an exhibition space, a major event room, and community spaces for meetings and learning programs.
Library visits are expected to quadruple to reach a million per annum, with the stunning library design creating a major visitor attraction.
The Geelong Library and Heritage Centre will stretch over more than 6,000 square metres and will include a children’s exploration and discovery zone, a heritage centre repository and reading room, a youth area and individual and group study spaces. There will also be a coffee shop, an exhibition space, a major event room, and community spaces for meetings and learning programmes.
Library visits are expected to quadruple to reach a million per annum, with the stunning library design creating a major visitor attraction.

  • Up to 100,000 library collection items
  • Exhibition and display areas
  • Children’s exploration and discovery zone
  • Internet zones and multipurpose computers
  • Young people’s space
  • Information and digital literacy training spaces
  • Reading and community lounges
  • Individual study and group learning spaces
  • Special collections and research rooms
  • Reflection of the Geelong region’s Indigenous heritage
  • Interaction with park and open space
  • Dedicated heritage centre reading room
  • Environmentally sustainable building design
  • September 2012 
    Adoption of draft design
  • Early 2013
    Planning permit process
  • April – May 2013
    Relocation of existing Geelong Library and Heritage services
  • Mid 2013
    Demolition of old building
  • Mid 2013
    Commencement of construction
  • Late 2015
    completion of construction
  • Late 2015 
    Opening of Geelong Library and Heritage Centre


댓글 없음:

댓글 쓰기